| 8151 | Maştağa | 7/30/2024 | 1 hour | Inspection | Cute kindergarten environment |
| 8152 | Maştağa | 7/27/2024 | 1 hour | Inspection | Around the polyclinic |
| 8153 | Maştağa | 7/25/2024 | 1 hour | Inspection | Around the polyclinic |
| 8154 | Maştağa | 7/23/2024 | 2 hours | Repair of the UIN line | Carpenter |
| 8155 | Maştağa | 7/22/2024 | 2 hours | Repair of the UIN line | School No. 112 |
| 8156 | Maştağa | 7/19/2024 | 1 hour | Inspection | 208 around school |
| 8157 | Maştağa | 7/18/2024 | 1 hour | Inspection | Surroundings of Tavaylikh |
| 8158 | Xəzər | 30.08.2024 | 3-4 hours | 10/ 409 preventive works of 0.4 sq. m | Bilgah settlement, garden 1 |
| 8159 | Xəzər | 29.08.2024 | 3-4 hours | 10/ 229 preventive works of 0.4 sq. m | Buzovna settlement, Ganjlik barracks |
| 8160 | Xəzər | 27.08.2024 | 3-4 hours | 10/ 430 preventive works of 0.4 sq. m | Bilgah settlement |
| 8161 | Xəzər | 26.08.2024 | 3-4 hours | 10/ 1318 preventive works of 0.4 sq. m | Bilgah settlement, garden 1 |
| 8162 | Xəzər | 23.08.2024 | 3-4 hours | 10/ Carrying out 499 preventive works of 0.4 sq.m | Bilgah settlement, garden 1 |
| 8163 | Xəzər | 19.08.2024 | 3-4 hours | 10/ 1321 preventive works of 0.4 sq.m | Bilgah settlement, garden 1 |
| 8164 | Xəzər | 09.08.2024 | 3-4 hours | 10/ 1322 preventive works of 0.4 sq.m | Bilgah settlement, garden 1 |
| 8165 | Xəzər | 05.08.2024 | 3-4 hours | 10/ 476 preventive works of 0.4 sq. m | Bilgah settlement, garden 1 |
| 8166 | Xəzər | 23.07.2024 | 3-4 hours | 6/0.4 kV TM 271 preventive works | Shuvalan settlement |
| 8167 | Xəzər | 23.07.2024 | 3-4 hours | 6/0.4 kV TM 337 performing preventive works | Shagan settlement |
| 8168 | Xəzər | 16.07.2024 | 3-4 hours | 6/0.4 kV TM 321 preventive works | Shuvalan settlement |
| 8169 | Xəzər | 19.07.2024 | 4-5 hours | y/st Shagan -TM 333 6 sq.m. nest inspection | Shagan settlement |
| 8170 | Xəzər | 18.07.2024 | 4-5 hours | y/st Shagan -TM 148 6 sq.m. nest inspection | Shagan settlement |
| 8171 | Xəzər | 17.07.2024 | 4-5 hours | y/st Shagan 1-TM 301 6 sq.m. nest inspection | Shagan settlement |
| 8172 | Yasamal | 01-31.08.2024 | 1-2 hours | 1279, 687, 423, 296, 1213, 274, 269, 1291, 1253, 603, 588, 386, 1116, 744, 1282, 739, 839, 1913, 1339, 1360, 489, | |
| 8173 | Yasamal | 01-31.08.2024 | 1-2 hours | Overhaul of Khirbat.TM 448-F1, Khirbat.TM 448-F2, Khirbat.TM 448-F3, Khirbat.TM 448-F4, 0.4 kV substation lines | Yasamal district |
| 8174 | Yasamal | 01-31.08.2024 | 1-2 hours | Overhaul of TM 132-Sov F1, TM 497 Yasam F3, 0.4 kV substation lines | The backup line will be energized |
| 8175 | Yasamal | 01-31.08.2024 | 1-2 hours | Measurement of resistance of earthing devices in TM No. 446,437 | The backup line will be energized |
| 8176 | Yasamal | 01-31.08.2024 | 1-2 hours | Current repair of load switches, disconnectors and earthing blades in TM No. 715,853 | The backup line will be energized |
| 8177 | Yasamal | 01-31.08.2024 | 1-2 hours | 490,707 - current repair of other electrical equipment with a voltage above 1 kV in TM | The backup line will be energized |
| 8178 | Yasamal | 01-31.08.2024 | 1-2 hours | Current repair of load switches, disconnectors and earthing blades on TM and KTM No. 715,853 | 11th Khirbat, Yasamal building |
| 8179 | Yasamal | 01-31.08.2024 | 1-2 hours | 711,290 - Current maintenance of VA and EQ on TM and KTM | The backup line will be energized |
| 8180 | Yasamal | 01-31.08.2024 | 1-2 hours | Current repair of oil switches in TM No. 848,890,134 | Yasamal, İnşaatçılar 20, Sh. Azizbeyov 12, M. Mukhtarov street |
| 8181 | Yasamal | 01-31.08.2024 | 3-4 hours | 802,796,797,798,689,90,28,433,765,776,883,489,580,3140,3163,3035,2979,518,1565 | Baku State University, Z. Aliyev, Matbuat avenue 18/7, Sh. Aliyev-21, Sh. Aliyev 42, D. Aliyeva, Ayna Sultanova 12a, Shafayat Mehdiyev 97, Y. Aliyev, Sh. Aliyev 85, Land Committee, 1 |
| 8182 | Suraxanı | 26.08.2024 | 2-3 hours | Regarding KTM 3806 reconstruction works | Hovsan settlement |
| 8183 | Suraxanı | 23.08.2024 | 1-3 hours | KTM 3173 in connection with landscaping works | Zigh settlement, Gum Island residential area |
| 8184 | Suraxanı | 13.08.2024 | 2-3 hours | TM 176 regarding landscaping works | Part of Yeni Guneshli settlement |
| 8185 | Suraxanı | 09.08.2024 | 2-3 hours | TM 161 regarding landscaping works | Part of Yeni Guneshli settlement |
| 8186 | Suraxanı | 05.08.2024 | 1-2 hours | Overhaul and current maintenance of TR-R #1 at Y/S 369, current, overhaul, testing and protection inspection of TR-R #1 5.6 MVA and its equipment | A part of Karachukhur settlement |
| 8187 | Suraxanı | 01.08.2024 | 1-3 hours | Current maintenance, protection inspection and testing of TR-R #1 16 MVA and #2 10 MVA at Y/S 366 | A part of Hovsan settlement |
| 8188 | Suraxanı | 25.07.2024 | 2-3 hours | Current and major repairs, testing and inspection of protection in Y/S BMTZ | Amirjan, a part of Bulbula settlements |
| 8189 | Suraxanı | 22.07.2024 | 2-3 hours | TR-R #1 6.3 MVA current repair, testing and protection inspection at Y/S 360 | Hovsan poultry housing complex |
| 8190 | Suraxanı | 19.07.2024 | 1-2 hours | Current and overhaul of 3.2 MVA TR-R at Y/S 73, testing, protection inspection and ongoing line maintenance along the line | A part of the territory of Amirjan |
| 8191 | Səbail | 28.08.2024 | 2 hours | Current maintenance on TM 1512 | Badamdar settlement |
| 8192 | Səbail | 23.08.2024 | 2 hours | Current maintenance on TM 1610 | Shikhov settlement |
| 8193 | Səbail | 19.08.2024 | 2 hours | Current maintenance on TM 1604 | Shikhov settlement |
| 8194 | Səbail | 12.08.2024 | 2 hours | Current maintenance on TM 1542 | Badamdar settlement |
| 8195 | Səbail | 08.08.2024 | 2 hours | Current maintenance on TM 1140 | Badamdar settlement |
| 8196 | Səbail | 02.08.2024 | 2 hours | Current maintenance on TM 655 | Shikhov settlement |
| 8197 | Səbail | 23.07.2024 | 2 hours | Current maintenance on TM 2571 | Badamdar settlement |
| 8198 | Səbail | 16.07.2024 | 2 hours | Current maintenance on TM 980 | Bayil settlement |
| 8199 | Səbail | 11.07.2024 | 2 hours | Current maintenance on TM 1576 | Badamdar settlement |
| 8200 | Nizami | 29.08.2024 | 3-4 hours | Repair and inspection work on TM 38 | M. Abbasov, K. Balakishiyev streets |