“Azerishig” OJSC is carrying out major reconstruction works in three villages included in Shatirli Administrative Territorial Representation of Jalilabad region: Shatirli, Buravar and Badamagaji villages. In general 1,500 people live in these three villages in the southern Regional Power Supply and Sales Department. Reconstruction works cover the entire electricity system in the village. These remote villages on the border with the Islamic Republic of Iran were first supplied with electricity in 1962. And over the past 58 years, the old network has expired and needs to be rebuilt. In order to renew the electricity supply in the mentioned villages, poles, power lines, meters are being renewed, complete transformer points are being installed. Upon completion, consumers will be provided with sustainable and high-quality electricity and electricity losses will be prevented.
Digər xəbərlər
- “Azərişıq” ASC cənub rayonlarında elektrik enerjisinin verilişini bərpa etmək üçün fasiləsiz işləyir 21 January 2026
- Sabunçu rayonunun bu ərazilərində fasilə yaranacaq 31 March 2026
- Elektron xidmətlərin tətbiqi elektrik təchizatı şəbəkəsinə qoşulma sahəsində mühüm addımdır 26 January 2026
- Abşeronun bu ərazilərində fasilə olacaq 10 January 2026
- Maştağa ETSİ-nə daxil olan bu ərazilərində fasilə yaranacaq 16 April 2026