S/S Region name Date Break time Name of the work Areas
7751 Yardımlı 2024.11.22-29 3-4 hours Replacement of defective wooden supports and damaged insulators on the 10-kv overhead line No. 5 from the 35/10-kv Arus y/st, pruning of the green mass under the line Horoni k, Yolacak k, Separadi k, Teshkan k
7752 Yardımlı 2024.11.6-7,20,26,28 4-5 hours Replacement of corroded wires, replacement of defective wooden supports and damaged insulators, pruning of green mass under the line in overhead line No. 4 of 10 kV from 35/10 kV Arus y/st Arsila, Lazran, Echara, Tazakend, Golyeri, Shikhlar, Zevin, Barjan, Chanakhbulag, Musakend, Astanli, Gendara
7753 Yardımlı 2024.11.1-4 3-4 hours Replacement of defective wooden supports and damaged insulators in overhead line No. 3 of 10 sq.m. coming from 35/10 sq.m. Arus y/st, pruning of the green mass under the line Jiy, Telavar, Porsava, Shovut, H/Shikhlar, Zeynalazir, Honuba, Gugavar, Tila,
7754 Yardımlı 2024.11.5-19 3-4 hours Replacement of defective wooden supports and damaged insulators in overhead line No. 1 of 10 sq.m. from Arus y/st of 35/10 sq.m., pruning of the green mass under the line Kechelakaran k, Afjadulan k, Varov k, Zangela k, Horavar k, Angovul k
7755 Yardımlı 2024.11.7-25 4-5 hours Replacement of defective wooden supports and damaged insulators on the 8 10-kv air line coming out of the 35/10-kv Yardymli y/st, pruning of the green mass under the line City, Ostayir, Dallekli, Gavran, Unech, Asadabad
7756 Yardımlı 2024.11.18-27 4-5 hours Replacement of defective wooden supports and damaged insulators on 6 10 sq air line coming out of Yardimli y/st of 35/10 sq. m., pruning of the green mass under the line Urakaran, Avun, Garagaya, Chayüzü, Nisagala, Shilavanga, Oku, Dagüzü, Peshtasar, Fındığli Kışlaq
7757 Yardımlı 2024.11.5-15 4-5 hours Replacement of defective wooden supports and damaged insulators on the 10-kv overhead line No. 5 coming from the 35/10-kv Yardymli y/st, pruning of the green mass under the line Osnakaran, Hamarkand, Anzov, Abasabad, Solgart, Zengaran, Allar, Shikhhuseynli, Burzunbul, Bilne
7758 Yardımlı 2024.11.4-21 4-5 hours Replacement of defective wooden supports and damaged insulators in 10 kv air line No. 3 from Yardimli y/st of 35/10 kv Daryavar, Sirık, Vargeduz, Odurakaran, Alchabulag
7759 Yardımlı 2024.11.6-14 3-4 hours Replacement of defective wooden supports and damaged insulators on the 10-kv air line No. 1 from Yardimli y/st of 35/10 kv, pruning of the green mass under the line Yardimli city, Dashkend village, Mishkireyin village, Gabagdibi village
7760 Astara 2024.11.23 2-3 hours Carrying out current repair works, oil change of oil switches in 35/10 kV Pensar YS Lelakepeshta, Tangerud, Mashkhan villages, Pensar, Shiyekaran, Kakolos, Kolatan, Shahagaci villages
7761 Astara 2024.11.25-26 2-3 hours Carrying out current repair work, oil change of oil switches in 35/10/6 kV Lovain YS Kijaba settlement, Gajimarde, Tazakend, Tülagüvan, Sipyalafadi, Ruadila, Turkeoba, Shematuk Lovain, Derjamahalla, Mashkhan villages
7762 Cəlilabad 2024.11.22-23 2-3 hours Inspection of 35 kV Lekin h/x and current repair works However, Shatyrli, Badamagac, Asadli, Musali, Zehmatabad, Kovuzbulag, Burovar
7763 Masallı 2024.11.16 2-3 hours Inspection of 35 kV Xyl h/x and current repair works Musakuçe-Gayaçol-Lüren Tazakend Sarchuvar Oncegala Khil-Sirabil 1 Yeddioymag-Gasimli, 2-Yeddioymag-Shiklar
7764 Masallı 2024.11.25,27 2-3 hours Inspection of 35 kV Eminli h/x and current repair works Sharafe-Agakisibeyli-Bala Tekla Old Alvadi Bina Khojavar Big Khojavar Banbashi-Kosakul Yeyankend-Abasbeyli-Khalfelar-Yelagac-Old Zuvand-Lezir-Alashar Gullutepe-Tatyan-Amirturbe-New Zuvand-Meshekanar
7765 Biləsuvar 2024.11.25 3-4 hours Current repair of oil switches in 110/35/10 kV Bilasuvar YS, oil replacement Bilasuvar city and surrounding villages
7766 Cəlilabad 2024.11.23 2-3 hours Oil change of oil switches in 35/10 kV Jalilabad YS City of Chalilabad, Saradabad, Shilavanga, Abishabad, Shabsnli, Sulucheshme, Sdovlatalibeyli, Kurds, Mollali, Astanli, Farzli, Abdullu, Hamargishlaq, Khalili Khalilabad, Sadatli,
7767 Lənkəran 2024.11.1 2-3 hours Oil change of 35/10 kV Sinovli oil switches Sinovli, Osakuche, Tukavila, Gegiran, Tuedo, Yeseton, Horavevc villages
7768 Cəlilabad 2024.11.4 3-4 hours 110/10 Shahriyar YS replacement of voltage tr-grid Sabirabad, Guneshli Alar,
7769 Cəlilabad 2024.11.15,20 3-4 hours Inspection of 110 kV II Masalli current repair works Jalilabad city and surrounding villages
7770 Lənkəran 2024.11.16,18 3-4 hours Carrying out current repair work at 35/10 kV Hirkan Ys Hirkan settlement, Mamusta, Siyavar, Vel villages
7771 Cəlilabad 2024.11.4 3-4 hours Inspection of 110 KV Samadabad current repair works Samadabad village
7772 Cəlilabad 2024.11.1 2-3 hours 35 kV Goytepe inspection and current repair works Goytepe city,
7773 Lənkəran 2024.11.5-6 2-3 hours Inspection of 35 kV Sinovli h/x and current repair works Sinovli, Osakuche, Tukavila, Gegiran, Tuedo, Yeseton, Horavevc villages
7774 Lerik 2024.11.6-7,18-19 2-3 hours 35/10 sq.m. No. 1 10 sq.m. Zarikümeco h/x from Hamarat y/st Davradibi and Dico villages
7775 Lerik 2024.11.13-14,27-28 2-3 hours 35/10 sq.m. Larmarud h/x No. 3, 10 sq.m., from Shingedulan y/st Nucu and Vamazıgon villages
7776 Lerik 2024.11.14 1.5 hours 35/10 sq. Rvarud y/st No. 2 10 sq. Rvarud h/x Razgov village
7777 Lerik 2024.11.25 1-2 hours 10 kv Veri h/x from 35/10 kv Veri y/st Veri and Tikaband village
7778 l 2024.11.6-7,21-22 1-3 hours 35/10 sq.m. Gosmalian h/x No. 7 10 sq.m. from Lerik y/st Gosmaliyan and Kalakhan village
7779 Lerik 2024.11.5-6,20-21 1-3 hours 35/10 sq.m. 35/10 sq.m. Bibiyan and Hamarmesha village
7780 Lerik 2024.11.4-5,19-20 2-3 hours 35/10 sq.m. from Lerik y/st No. 6 10 sq.m. Pirasora h/x Pirasora and Nuravud village
7781 Cəlilabad 2024.11.22-24 3-4 hours Replacement of unusable supports and insulators of 10 kV on 10 kV Karazanjir overhead line No. 8. Karazanjir village
7782 Cəlilabad 2024.11.25-26 2-3 hours Replacement of useless supports and insulators of 10 kV on the 10 kV Adnalı-Badirli overhead line No. 11. Adnali village
7783 Cəlilabad 2024.11.19-23 4-5 hours Replacement of 10kv unserviceable supports and insulators on 6th 10kv Sarhadabad overhead line. Shilavanga village
7784 Cəlilabad 2024.11.12-16 4-5 hours Replacement of useless supports and insulators of 10 kV on the 10 kV Astanli overhead line No. 8. Astanli village
7785 Cəlilabad 2024.11.12-13 2-3 hours Replacement of useless supports and insulators of 10 kV on 10 kV Uchtepe overhead line No. 3. Mehdiabad settlement
7786 Cəlilabad 2024.11.18-29 3-4 hours Replacement of useless supports and insulators of 10 kv on the 10 kv Privolnoye overhead line No. 7. Priovolnoye village
7787 Cəlilabad 2024.11.16-19 2-3 hours Replacement of useless 10-kv supports on the 10-kv Agdash overhead line No. 6. Agdash village
7788 Masallı 2024.11.30 2 hours 110/35/10 sq. Kolatan h/x of 10 sq. No. 5 from Tukla y/st has expired. Kolatan village
7789 Masallı 2024.11.28 2 hours 110/35/10 sq. m. Replacement of unusable wires in 10 sq. m. No. 4 Badalan h/x from Tukla y/st, pruning of green mass under the line, trimming of lines Badalan, Demirci Chaigirag and Ashurlu villages
7790 Masallı 2024.11.26 2 hours 110/35/10 sq m of Tukla y/st, 10 sq m of Mahmudavar h/x No. 1, pruning of the green mass below the line Mahmudavar, Rüdekanar, Mololon and Askarabad villages
7791 Masallı 2024.11.26 3 hours 110/35/10 sq.m. in the 10 sq.m. No. 10 Gizylavar h/x from Tukla y/st, replacement of unusable wires, pruning of the green mass under the line Khallikalli and Gargalig villages
7792 Masallı 2024.11.26 2 hours Pruning of the green mass below the line in the 10 sq. m. No. 4 Gargalyk h/x from the 35/10 sq. m. Khallikalli and Gargalig villages
7793 Masallı 2024.11.18 2 hours 35/10 sq.m. in Yeyenkend h/x No. 8 of 10 sq.m. from Banbaşı y/st. Yeyenkend, Yelagac, Abasbeyli, Khelfeler, Alashar, Lezir villages
7794 Masallı 2024.11.1 3 hours 35/10 sq.m. Reconstruction work is carried out in the 10 sq.m. No. 3 Kohne Alvadi h/x from Banbaşı y/st. Old Alvadi village
7795 Masallı 2024.11.14 2 hours 35/10 kv Xil y/st 10 kv No. 7 Shikhlar h/x has expired. Shikhlar and 2-Yeddioymag villages
7796 Masallı 2024.11.10 2 hours Replacement of damaged insulators of 0.4 sq.m. in 10 sq.m. Outpost No. 4 h/x from Xyl y/st of 35/10 sq.m. Oncagala village
7797 Masallı 2024.11.6 3 hours 35/10 sq.m. has expired in 10 sq.m. Musakucha, Geyecol, Luren villages
7798 Masallı 2024.11.6 2 hours Replacement of damaged insulators of 10 and 0.4 k in the 10 sq. m. 9 Arkivan h/x from Masalli y/st of 110/35/10 sq.m., pruning of the green mass under the line, trimming of the lines Erkivan settlement, Kosakul village
7799 Masallı 2024.11.5 2 hours 110/35/10 sq.m. Replacement of damaged insulators of 10 sq.m. on 10 sq.m. No. 2 Arkivan h/x from Masalli y/st, pruning of green mass under the line Arkivan settlement
7800 Masallı 2024.11.5 2 hours Replacement of damaged insulators of 10 and 0.4 sq.m. in 10 sq.m. Arkivan h/x, 10 sq.m. from Masalli y/st of 110/35/10 sq.m., pruning of green mass under the line Arkivan settlement